SHUBHAM ENGINEERS
Home » Products » Concrete Flooring Solutions » Tremix Flooring

Tremix Flooring



<< Previous   Tremix Flooring
Product Specification

 Tremix Flooring 

Ironite Heavy Duty Industrial Flooring

Ironite since 1912, after extensive laboratory and field trials offer metallic, non-metallic, light-reflective  and coloured  dry shakes  to be broadcast over green concrete for both industrial and residential  complexes. Ironite Dry Shakes, to be incorporated directly into finished floors, offer decorative coloured  floors which are also abrasion and impact resistant.

While Ironite quality products are not always the cheapest to  buy they are usually the least expensive  to  install and  certainly the most economical to  maintain  in  the long  run under costly equipment or structures.

Product

Description

Application

Coverage

Applied Thick-Ness

Packing & Shelf Life

IRONITE NO. 1

Metallic Floor Hardner to be mixed with Granolithic topping for heavy duty floors.

Ironite powder to be incorporated into Granolithic
topping for Light Medium Heavy duty flooring.

  • Light duty 2 Kgs/m2
  • Medium duty 3 Kgs/m2
  • Heavy duty 4 Kgs/m2

12 to 18 mm

50 Kgs H.D.P.E BAGS.
12 months.

IRONITE NO. 3

Metallic Dryshake for extra heavy duty floors. Offers maximum resistanace to abrasion, impact & high point loads, considarably extends the servicable life of the floor.

To broadcast over green concrete.

3.5 Kgs to 8 Kgs/m2 as per service conditions.


1.5 to 3 mm


25 Kgs H.D.P.EBAGS. 6 months.




IRONITE NO. 3

Coloured & light reflective, abrasion & impact resistant heavy duty Industrial Flooring. (Metallic Base)

To broadcast over green concrete.

4.5 Kgs to 8 Kgs/m2 as per service conditions.

2 to 3 mm

25 Kgs H.D.P.E BAGS.6 months.

IRONITE NO. 4

Non-Metallic dryshake available in Natural white & coloured shakes for Industrial/Residential complexes.

To broadcast over green concrete.

4.5 Kgs to 6 Kgs/m2

2 to 3 mm

25 Kgs H.D.P.E BAGS 6 months

IRON CURE

Membrane curing & sealing compound, provides required curing retains moisture in concrete. (Additional water curing not necessary)

Applied with brush or spray shake well before use.
To be applied over freshly laid finished slab surface.

200 to 250 gm/m2

20 Kgs. 200 Kgs.

6 Months


Floor Repair
  • Areas subjected to heavy traffic such as loading bays, trucking lanes, machine shop, ramps, spillways, godowns, workshop, jetties etc. become uneven and break down due to constant impact & abrasion. Such flooring need to undergo periodic repairs. Ordinarily they are repaired by using cement concrete which requires a long curing time.
  • In todays age and time, factories which are running round the clock cannot provide adequate curing time. Hence we suggest the use of instant floor hardner in which flooring is ready to use in small period. It is an ideal, economical & established product in world of floor repairing.

Product Code : 25

Other Products in 'Concrete Flooring Solutions' category
Car Park Concrete Flooring
Car Park Concrete Flooring
Ramp Concrete Flooring
Ramp Concrete Flooring
Concrete Flooring Solution
Concrete Flooring Solution
Ironite Tremix Concrete Flooring
Ironite Tremix Concrete Flooring
Ironite Heavy Duty Industrial Flooring
Ironite Heavy Duty Industrial Flooring
 Industrial Heavy Concrete Flooring
Industrial Heavy Concrete Flooring
 
<< Back


 
 
  
 
 
 


Let tradeindia.com find Quality Suppliers for you!
Submit your Buying Requirements, and get matched Suppliers details.
City Not Found
Describe Your BUYING Requirement
*Security Code Please enter the letters displayed in the picture below into the box for "Security Code"

I agree to abide by all the Terms & Conditions as laid down by tradeindia.com

 
Copyright © 2012-13 by SHUBHAM ENGINEERS All Rights Reserved.